Grand Flame Sdn Bhd (GFSB) a CIDB G7 registered contractor was established in 2009 by a group of dynamic and skilled professionals and specializes in soil improvement. GFSB is experienced in implementing advanced installation techniques and supported by hydraulic and static rigs and equipment operated by qualified personnel. It has pool of qualified staffs with vast experience and high skills and is always prepared to undertake challenging projects.
• Supply and Installation of Prefabricated Vertical Drain
• Supply and lay Geo-synthetic material
• Geotechnical Instrumentation and performance interpretation
• General contracts
Optimization of Design & Fast Track Construction
Innovative Ground Improvement Schemes
Proven Professionalism and Excellence
Rapid mobilization of equipment and human resources for fast track projects
Able to provide reliable equipment and skilled and experienced field managers
Well experienced professional Engineers to offer reliable techno-economical geotechnical solutions
Grand Flame Sdn Bhd (GFSB) a CIDB G7 registered contractor was established in 2009 by a group of dynamic and skilled professionals and specializes in soil improvement. GFSB is experienced in implementing advanced installation techniques and supported by hydraulic and static rigs and equipment operated by qualified personnel. It has pool of qualified staffs with vast experience and high skills and is always prepared to undertake challenging projects.

Owner:
JKR
Description:
Proposed Mixed Development On Lot 66166, KK257, Mukim Tanjung Dua Belas, Daerah Kuala Langat, Selangor Darul Ehsa
Quantity:
13,500,000 lin.m
Duration
June 2018
Owner:
West Coast Expressway Sdn Bhd
Description:
Privatisation Of Lebuhraya Persisiran Pantai Barat (Taiping – Banting) Section 6 – Kapar Interchange to Assam Jawa Interchange
Quantity:
7,000,000 lin.m
Duration
June 2018
Owner:
Gamuda Land Bhd
Description:
Permohonan Melanjutkan Kebenaran Kerja Pengawalan Kebakaran Melalui Kaedah “Earth Capping” Bertarikh 11 Mei 2016 Untuk Memerangi Kebakaran Tanah Gambut Pada Musim Kemarau Yang Akan Datang Selaras Dengan Keperluan Pembangunan Di Atas Tanah Gambut Rancangan Fizikal Negara Ketiga
Quantity:
5,260,650 lin.m
Duration
August 2018
Owner:
JKR
Description:
Development and Upgrading of The Proposed Pan Borneo Highway In The State of Sarawak, Malaysia – Phase 1 Pantu Junction to Btg Skrang
Quantity:
1,698,666 lin.m
Duration
August 2018
Owner:
Aspen Vision City Sdn Bhd
Description:
Cadangan Menjalankan Kerjatanah di Atas Lot 282, Mukim 13, Bandar Cassia, Batu Kawan, Seberang Perai Selatan, Pulau Pinang
Quantity:
5,785,414 lin.m
Duration
Dec 2016
Owner:
West Coast Expressway Sdn Bhd
Description:
Privatisation Of Lebuhraya Pesisiran Pantai Barat (Taiping – Banting) Section 9 – Kg Lekir Interchange to Changkat Cermin Interchange
Quantity:
3,900,000 lin.m
90,166 (NW)
192,439 (HS)
Duration
Nov 2016
Owner:
Sime Darby
Description:
The Proposed Construction And Completion Of Earthworks and Other Related Works For Development Of Phase 1 (R10A, R10B And Detention Pond), Bandar Bukit Rajah Stage 2, Mukim Kapar, District Of Klang, Selangor For “Supply and Install Prefabricated Vertical Drain (PVD)”, Selangor
Quantity:
2,800,00 lin.m
Duration
Dec 2016
Owner:
JKR
Description:
Membina Jalan Baru 4 Lorong 2 Hala Dari Jalan FT092 Ke Persimpangan Punggai (J91) Pengerang, Kota Tinggi, Johor (P4)
Quantity:
2,900,000 lin.m
Duration
April 2018
Owner:
SKVE Holdings Sdn Bhd
Description:
Privatisation Of The South Klang Valley Expressway
Quantity:
2,747,120 lin.m
Duration
May 2018
Owner:
Permodalan Nasional Berhad (PNB)
Description:
Proposed Construction and Completion of Earthworks, Pond, Main Drain, Retaining Wall, Geotechnical Works and Other Associated Work for Proposed Mix Development at Pekan Datok, Daerah Kulala Langat, Selangor
Quantity:
3,000,000 lin.m
Duration
Dec 2018
Owner:
JKR
Description:
Development and Upgrading of The Proposed Pan Borneo Highway In The State of Sarawak, Malaysia – Phase 1
Pantu Junction to Btg Skrang
Quantity:
1,698,666 lin.m
Duration
Aug 2018
Owner:
TNB
Description:
Establishment of PMU 132kV Tanjung Gemok, Rompin, Pahang
Quantity:
150,000 lin.m
Duration
Feb 2015
Owner:
JKR
Description:
Cadangan Membina Bangunan Ibu Pejabat Yang Baru Untuk Lembaga Pelabuhan Klang Fasa 1 – Kerja Tanah
Quantity:
60,000 lin.m
Duration
Aug 2014
Owner:
JKR
Description:
Membina Jalan Baru 4 Lorong 2 Hala Dari FT092 Ke Pularek Kota Tinggi, Johor
Quantity:
1,945,800 lin.m
Duration
Oct 2014
Owner:
Malaysian Aiport Berhad
Description:
KLIA Landslide Development
Quantity:
800,000 lin.m
Duration
July 2014
Owner:
TNB
Description:
Fast Track 3A Project,Manjung Power Plant, Perak.
Quantity:
800,000 lin.m
Duration
Apr 2014
Owner:
JKR
Description:
Cadangan Membina Pejabat LHDN di Teluk Intan, Perak
Quantity:
360,000 lin.m
Duration
Apr 2014
Owner:
TNB
Description:
1 x 1000 MW Manjung Coal Fired Power Plant
Quantity:
1,945,800 lin.m
Duration
Jan 2014
Owner:
I&P Berhad
Description:
Proposed For Precinct 3 & 8, Soil Improvement Woks and Associated Infra works at Alam Impian untuk Tetuan I&P Berhad
Quantity:
225,000 lin.m
Duration
Feb 2014
Owner:
MOE
Description:
SK Padang Garuda School Project, Kuantan, Pahang
Quantity:
50,000 lin.m
Duration
Feb 2014
Owner:
JKR
Description:
Cadangan Membina Dan Menyiapkan Jalan Sambungan B18/B20 Di Daerah Sepang, Selangor – Fasa 111B
Quantity:
163,000 lin.m
Duration
Aug 2013
Owner:
Ministry Of Agricultur (MOA)
Description:
Cadangan Membina Dan Menyiapkan Institut Pengurusan Peladang Tanjung Karang, Mukim Tanjung Karang, Selangor
Quantity:
135,000 linm
Duration
July 2013
Owner:
TNB
Description:
Kerja – Kerja Membaikpulih Tanah Bagi Projek 275KV Elpion Silicon Switching Station
Quantity:
495,000 lin.m
Duration
Jun 2013
Owner:
Pertubuhan Hospis Klang
Description:
Site Clearance, Earthwork And Embankment Treatment For Cadangan Pembangunan Di atas Lot PT 140457, Mukim Kelang, Daerah Kelang, Selangor Darul Ehsan Untuk Pertubuhan Hospis Klang
Quantity:
52,000 lin.m
Duration
May 2013
Owner:
TNB
Description:
1 x 1000 MW Manjung Coal Fired Power Plant
Quantity:
1,200,000 lin.m
Duration
May 2013
Owner:
I&P Berhad
Description:
Proposed Soil Improvement Works And Associated Works, At Phase A1-06 Alam Impian, Seksyen 35,
Shah Alam, Selangor Darul Ehsan For Tetuan I&P Alam Impian Sdn Bhd
Quantity:
30,000 lin.m
Duration
Apr 2013
Owner:
JKR
Description:
Cadangan Membina Dan Menyiapkan Klinik Kesihatan 3 (Cermai 2) Dengan Kuarters, Benut, Pontian , Johor.
Quantity:
214,000 lin.m
Duration
Oct 2012
Owner:
SP Setia Berhad
Description:
Proposed Earthworks for Cadangan Pembangunan Perumahan Dan Perniagaan, Blok 7, Cyber 1,
Persiaran Semarak Api, Zon Pembangunan Flagship Cyberjaya, Selangor D.E for Setia Eco Glades Sdn Bhd
Quantity:
3,300,000 lin.m
Duration
Oct 2012
Owner:
Tanjong Agas Supply Base & Marine Services Sdn Bhd
Description:
Proposed Access Road And Platform Preparation For The Umbilical Plant At Tanjong Agas Oil & Gas And Logistics Industrial Park,
Tanjung Agas, Pekan, Pahang/p>
Quantity:
4,128,030 lin.m
Duration
May 2012
Owner:
TNB
Description:
Establishment of New PMU 132/33KV Tunjang GIS, Kedah
Quantity:
180,000 lin.m
Duration
March 2012
Owner:
JTNB
Description:
Establishment of New PMU 132/33KV Bayan Mutiara GIS and Access Road, Penang
Quantity:
80,000 lin.m
Duration
March 2012
Owner:
JKR
Description:
Menaiktaraf Jalan Kg. Sg. Telor Dari Jalan Tai Hong Ke Jalan Kulai/Kota Tinggi
Quantity:
44,000 lin.m
Duration
Feb 2012
Owner:
ECERD
Description:
The Proposed Construction and Completion of Earthworks for Phase 2 at Kerteh Polymer Park in Lot Q, Kerteh,
Terengganu for East Coast Economic Region Development Council (ECER)
Quantity:
2,019,580 lin.m
Duration
Aug 2012
Owner:
Tenaga Nasional Berhad (TNB)
Description:
Establishment of New PMU 132/33 kV Penaga GIS
Quantity:
120,000 lin.m
Duration
Feb 2012
Owner:
Jabatan Kerja Raya
Description:
Menyiapkan Kerja – Kerja Menaiktaraf Persimpangan Di Bandar Sultan Sulaiman / Pintu 2 Northport Pelabuhan Kelang, Selangor
Quantity:
674,071 lin.m
Duration
Jun 2011
Owner:
Tenaga Nasional Berhad (TNB)
Description:
Propose Large Coal-Fired Power Plant Feasibility Study At Sultan Azlan Shah Power Station, Manjung, Perak
Quantity:
175,000 lin.m
Duration
Jun 2011
Owner:
Seaport Worldwide
Description:
The Proposed Petroleum And Maritime Development At Tg Bin Johor (Phase 1)-Reclamation And Basic Infrastructure Works
Quantity:
8,467,000 lin.m
Duration
Jun 2011
Owner:
JKR
Description:
Cadangan Membina Dan Menaiktaraf Jalan Sg Telor Dari Jalan Tai Hong Ke Jalan Kulai-Kota Tinggi Daerah Kota Tinggi, Johor
Quantity:
70,000 lin.m
Duration
May 2011
Owner:
Malaysian Aiport Berhad
Description:
Cadangan Menjalankan Kerja Tanah Diatas Sebahagian Lot 89, Seluas 50 ekar Bagi Cadangan
Pembangunan Komersial (Lanside Development) KL Ineternational Airport (KLIA) Mukim Labu, Daerah Sepang, Selangor
Quantity:
2,265,120
Duration
Feb 2011
Owner:
PLUS
Description:
Proposed Bukit Gambir Interchange and Toll Plaza
Quantity:
917,000 lin.m
Duration
Sept 2010
Owner:
Seaport Worldwide
Description:
PMU, Tanjong Bin
Quantity:
3,000,000 lin.m
Duration
Oct 2010
Owner:
KTMB
Description:
Electrified Double Tracking Project Between Ipoh to Padang Besar –
Package N2 0 S5 @ CH98500 Sg Korok
Quantity:
150,000 lin.m
Duration
Jun 2010
Owner:
Jabatan Kerja Raya (JKR)
Description:
Cadangan Jalan Baru Lebuhraya Seremban – Port Dickson Ke Laluan Persekutuan
5 Dari Pasir Panjang Ke Linggi, Negeri Sembilan.
Quantity:
50,000 lin.m
Duration
Jun 2010
Owner:
Kementerian Dalam Negeri, Malaysia
Description:
Cadangan Pembinaan Pangkalan Polis Marin Di Atas Lot PTD
43161 Dan Sebahagian Lot 7303, Mukim Bandar Penggaram, Batu Pahat, Johor D.T.
Quantity:
150,000 lin.m
Duration
Apr 2010
Owner:
Jabatan Kerja Raya (JKR)
Description:
Cadangan Membina Dan Menyiapkan Balai Polis, Hutan Melintang, Perak D.R.
Quantity:
150,000 lin.m
Duration
Feb 2010
Owner:
Tanjong Agas Supply Base & Marine Services Sdn Bhd
Description:
Cadangan Pembangunan Infrastruktur Bagi Keperluan Projek Tanjung Agas Supply Base & Marine Services, Taman Industri Minyak & Gas Maritime Di Tanjong Agas, Pekan, Pahang D.M.
Quantity:
8,340,000 lin.m
Duration
Jan 2010
Clients
Projects
Cup Of Coffee
Success
We are committed to providing our clients with the best possible service and to ensure that service is tailored to meet our clients' individual needs.
GRAND FLAME SDN BHD. No.40-3, Jalan Kuchai Maju 10 (Jalan 11/116B) Kuchai Entrepreneurs Park, Off Jalan Kuchai Lama, 58200 Kuala Lumpur.
+603-7982 7419
+603-7981 8581
No.40-3, Jalan Kuchai Maju 10
Off Jalan Kuchai Lama,